<li id="6a4gw"><wbr id="6a4gw"></wbr></li><strike id="6a4gw"><noscript id="6a4gw"></noscript></strike>
    <dfn id="6a4gw"><input id="6a4gw"></input></dfn>
    <delect id="6a4gw"></delect>
  • <menu id="6a4gw"></menu>
    Changzhou Yuping Chemical Co., Ltd.
       
     
     
    Add:158 Xuecheng Road, Xueyan Town,
    Wujin City, Jiangsu, China (213169)
    Tel:+86-519-86160288, 86158021,
    86158322, 86160118, 86160228
    Fax:+86-519-86162202
    E-mail:jushun@liyangchem.com

    SG new defoamer for delayed coking tower
    Brief

    Delayed coking tower is one important equipment of residuum process, but high air spped may produce a large of foam in the coking tower; at the samt time, it may produce a large of settled carbon on the pipe wall. To handle these problem, we developed this product, it can recue the height of foam and improve the coking ability, therefore, it can elongated the application life of coking tower.

    Quality standard

    No. Item Value
    1 Appearance 1.300 to 1.450
    2 Density 20°C g/cm3 0.96 to 1.05
    3 kinematical viscosity ,25°C, mm2/S, ≤ < 150
    4 congealing point °C≤ ≤-30
    5 Solubility dissolvedin diesel oil
    6 Flash point °C > 70
     
     
    點(diǎn)擊這里給我發(fā)消息
     
     
     
     
    制服肉丝亚洲中文字幕,av无码网站久久,91精品久久人人妻人人做,中午字幕日韩无码
      <li id="6a4gw"><wbr id="6a4gw"></wbr></li><strike id="6a4gw"><noscript id="6a4gw"></noscript></strike>
      <dfn id="6a4gw"><input id="6a4gw"></input></dfn>
      <delect id="6a4gw"></delect>
    • <menu id="6a4gw"></menu>